Yesterday the guys cut out the water tank that was on the 3rd floor. However, it turned out to have a concrete base. That is getting removed today via jackhammer. The Master Suite is all demo'd and cleaned out.. The footings get dug out tomorrow to lay down insulation. Roofer also comes out tomorrow. I believe that today the columns , from front porch, get removed to to be restored. I am not sure on that one. We have other colulmn pieces that we may use instead. Either way, paint will need to be stripped and sanded.
The Well guy is coming out today or tomorrow to start running lines from pump to house. As soon as he is done, OPPD will come out and run power lines. We are also having the septic guy and the plumber out next week. We have a 2nd Concrete guy coming out next week to bust out and remove the remain concrete on the main level. Things are in motion. The plan is 4 more months till we move in.
Water Tank pieces out in yard.
Concrete Base