Carriage House, Summer Hill Farm, James Hervey Pratt, Magee

Sunday, February 3, 2019

The Attic Con't

Day 3

Making Progress!! More sub floor and framing.





The ATTIC con't

Day 2

Nice Start!  They did some cleaning, started on the new sub-floor and framing.






The Attic Re-Start

Our 2019 Project is THE ATTIC

Last year we had stairs put in. This so we could build a bedroom up there for our teenage son. We currently have 3 boys sharing a room.  However, I lost my job at the end of March and we had to stop. Almost a year later, we are back at. Our ceiling has been ripped open this whole time with boards and insulation covering the hole. Not the best situation but we managed.

Day one. 
This was actually several days but it was pre-planning. We had several people look at the attic to get feedback and some bids.
Pics of what were were dealing with








New Pool Location Part 2


As Suzy started to back fill with sand, I built a platform to attach to pool ladder to.



The next day, Father's Day, Suzy finished with sand and started to top it with dirt to prepare for landscaping.


UPDATE..
It's Feb 2018. I see I never finished the pool post. Oops!

Pool needs some landscaping still but kids love it :) We are keeping the pool up. We usually take it down every Fall.  It currently is 2/3 full and was winterized. We are just keeping our fingers crossed that the cold temps don't destroy it.